In the context of global carbon neutrality, the construction of charging infrastructure, especially the development of public electric charging points, has become an important subdivision of the development of new energy vehicles.
With the development of charging pile-related technologies, the global charging pile industry has also ushered in a good opportunity for development.
The location of the public electric charging points should be considered in consideration of the urban electric vehicle development plan, and closely combined with the current situation of the distribution network and the short-term and long-term planning, so as to meet the requirements of the charging station for power supply and the requirements of the power grid for the power quality control of the charging station.
NO |
Parameters |
Public Electric Charging Points |
||
General Requirements | ||||
1 |
EV Charger Type |
DC |
||
2 |
Charger Capacity |
50KW/60KW |
80KW |
|
3 |
Product Model NO. |
ENC-DCL060A/B |
ENC-DCL080B |
|
4 |
Mounting |
Ground-Mounted |
||
Input Requirements | ||||
5 |
AC Supply System |
Three-Phase, 5 Wire AC system |
||
6 |
Nominal Input Voltage |
AC380V±15% |
||
7 |
Input Frequency |
45-65Hz |
||
Environmental Requirements | ||||
8 |
Ambient Temperature |
-25 to 55°C |
||
9 |
Ambient Humidity |
5 to 95% |
||
10 |
Storage Temperature |
-40 to 70°C |
||
Mechanical Requirements | ||||
11 |
IP Ratings |
IP 54 |
||
12 |
Cooling |
Air-cooled |
||
Output Requirements | ||||
13 |
Number of Outputs |
1 or 2 |
2 |
|
14 |
Type of Each Output |
DC200-750V |
||
15 |
Single Output Max. Current |
200 Amp |
||
16 |
Power Factor |
≥0.99(50% load above) |
||
User Interface & Display Requirements | ||||
17 |
Display & Touch-Screen |
7 InchesTouch Screen with Shell |
||
18 |
User Authentication |
Mobile Application or User Interface / QR Code/RFID Card /Password Login |
||
19 |
Metering Information |
Consumption Units |
||
Communication Requirements | ||||
20 |
Communication between EVSE and Central Server |
OCPP 1.6J Protocol (Optional) |
||
21 |
Interface between Charger and CMS |
Ethernet/3G/4G/WIFI (Optional) |
||
Protection & Safety Requirements | ||||
22 |
Executive Standard |
IEC 62196 2017, IEC 61851 2017, SAE J1772,CHAdeMO etc. |
||
23 |
Safety Parameters |
Over Current, Under Voltage, Residual Current, Surge Protection, Leakage Protection, Short Circuit, Over Temperature, etc. |
The charger gun can meet different customers requirements with:
EU Standard (62196-3 IEC2011 CCS-2)
GB/T Standard (GB/T 20234.2-2015)
Us Standard (62196-3 IEC2014 CCS-1)
JPN Standard (CHAdeMO: JEVS G 105)
Tepkos public electric charging points design and producing fully considered the safety using, so all our charger have below safety features during design and producing:
There are four different charging method of our public electric charging points as options:
Payment method of Tepkos public electric charging points can be scan QR code or swipe card two options:
Tepkos public electric charging points are suitable for many occasions:
With more than 30000 square meters of production plants and more than 50 reserachers , our factory has strong R&D advantages and a stable production base in Nanjing, China.The daily output of AC EV charger is 2000 units, DC EV charger is 300 units.Annual cumulative shipment is more than 100,000 units.
Our factory get the certification of ISO9001,ISO14001,ISO45001,products has UL,CE,Rohs,,FCC and so on.
All the public electric charging points are packed with carton box and poly wooden case to avoid any damages.
http://www.juswinnewenergy.com/